20 January 2026 3:04 PM
Screen Reader Access
  • Decrease Text Size Normal Text SizeIncrease Text Size
  • Black Theme
  • Default Theme
  • Red Theme
  • Green Theme
  • Orange Theme
  • English
  • Hindi
Search
Search
  • Contact us
  • Tenders
  • Reach Us
  • Recruitment

On Going Projects

  • Design of a Demonstration Plant based on a Hybrid Process (Cryogenic+ PSA) for the production of Grade “A” Helium.
  • Conceptualization robotics application in oil and gas Industries: Case study on unloading catalyst from Large Tank.
  • Impact studies of LPG quality parameters on pipeline corrosion: Experimental and CFD simulation activities.
  • Setting up of a demonstration plant for production of DMethanolone (01) kg/day (Process design and engineering)
  • Hproduction from H2S using thermo-chemical Sulfur Iodine cycle (Process design and engineering)


No wpWBot Theme Found!

X
wpChatIcon